BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//IEEE Life Members - ECPv6.17.1//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:IEEE Life Members
X-ORIGINAL-URL:https://life.ieee.org
X-WR-CALDESC:Events for IEEE Life Members
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20230312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20231105T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20240310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20241103T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20230929T090000
DTEND;TZID=America/New_York:20230929T120000
DTSTAMP:20230928T171143Z
CREATED:20230630T111232Z
LAST-MODIFIED:20230928T171143Z
UID:4259-1695978000-1695988800@life.ieee.org
SUMMARY:Tour – TECO Big Bend Modernization
DESCRIPTION:The IEEE Florida West Coast Section Life Members Affinity Group (LMAG) and Power & Energy Society/Industry Applications Society (PES/IAS)\, in collaboration with TECO is bringing to the IEEE community this awesome behind the scenes tour of the Big Bend Modernization Project located in Apollo Beach. This is a great event for Life Members to get connected with fellow IEEE Members and the community.\nTampa Electric (TECO) completed the Big Bend Modernization project safely\, on time and under budget. Big Bend Unit 1 is now the most efficient generator in Tampa Electric’s fleet. The project has repowered Big Bend Unit 1 with state-of-the-art combined-cycle technology and has eliminated coal as that unit’s fuel. Construction began in August 2019\, and the project came online Dec. 16. Crews worked more than 3.5 million hours with no lost-time injuries. The project is capable of producing 1\,090 megawatts (MW)\, which is enough energy to power more than 250\,000 homes. The company also retired Unit 2\, and Unit 3 will retire in spring 2023. Unit 4 remains in operation with coal or natural gas. "This project is improving the land\, water and air emissions at Big Bend\, and it is a continuation of TECO’s great environmental record\," said Archie Collins\, president and chief executive officer of Tampa Electric. "This investment in cleaner energy will provide significant savings to customers – and will further reduce our use of coal."\n**IMPORTANT** As participants register for this event\, please note that ALL attendees will be responsible for supplying and bringing their own personnel protective equipment (PPE) including steel-toe boots\, cotton shirt and pants\, hard hat\, and safety glasses.\nThere will be a group lunch following the tour with the Life Members Affinity Group and those who attend. Details to follow.\nAdditional information will be provided ahead of the event via email to those registered.\nCo-sponsored by: Tampa Electric (TECO)\nSpeaker(s): Marnix A. Groenendijk\, PE\,\n603 Big Bend Rd\, Apollo Beach\, Florida\, United States\, 33572\, Virtual: https://events.vtools.ieee.org/m/365627
URL:https://life.ieee.org/event/tour-teco-big-bend-modernization/
LOCATION:603 Big Bend Rd\, Apollo Beach\, Florida\, United States\, 33572\, Virtual: https://events.vtools.ieee.org/m/365627
CATEGORIES:Meetings of Interest
ATTACH;FMTTYPE=image/jpeg:https://life.ieee.org/wp-content/uploads/featured-image-event-01.jpg
END:VEVENT
END:VCALENDAR